Refurbishing Project of Jebel Ali hotel
Recently our vessels tug Bream Ann (500 Horsepower) under the command of Capt. Suparlin Parulian, Barge Suez Ann (1200 dwt tons) and our Manitowoc crane of 130 Ton capacity operated by our Crane operator Mr. Baqir Raza worked at a refurbishing project of Jebel Ali hotel replacing old piles that had come to the end of their life cycle. All LSI and client material was loaded at LSI base in Sharjah Hamriyah, the project was carried out by our Class A and long-term Client who is a leading local/UAE national construction company. The project was completed within the projected time and budget.
All equipment’s and personnel returned back safely to LSI base. Well done to all involved.