October 22 2018

Pipe Piling Installation for the new Marina Sites

2018 Operations Department, Pile Installations

Recently LSI Spud Barge “Khor Ann 2” along with NCK Crane C60 completed a Dubai Harbour Project and Jumana island for our good and repeat Client. The project scope was to complete Pipe Piling Installation for the new Marina Sites.
The barge loaded with the NCK C60 Crane was towed to the project site by LSI Vessel Bass Ann under the command of Capt. Gulnyyaz Gulnyyazov.
Pipe Piling Installation for the new Marina Sites
Pipe Piling Installation for the new Marina Sites
Pipe Piling Installation for the new Marina Sites
Pipe Piling Installation for the new Marina Sites
Pipe Piling Installation for the new Marina Sites
Pipe Piling Installation for the new Marina Sites
Pipe Piling Installation for the new Marina Sites
Pipe Piling Installation for the new Marina Sites
Pipe Piling Installation for the new Marina Sites
Pipe Piling Installation for the new Marina Sites
Pipe Piling Installation for the new Marina Sites

Related Posts

Maintenance of Navy Aircraft Carrier

2018

Maintenance of Navy Aircraft Carrier

Transportation of Soil Investigation Rig and Pickups

2018

Transportation of Soil Investigation Rig and Pickups

Jumeirah Islands Project 14

2018

Marine Construction Project at Jumeirah Islands 2

Recent Posts

  • Network Tower Modification Project
  • Towages Done by LSI
  • Raz Markaz Oil Terminal Project
  • Acquisition of New Vessels and Crane
  • Excavation works and Quaywall placing at Al Fiyay Island, Abu Dhabi
  • 2021
    • Navigation Pile repair work of the Floating Bridge, West Side at Dubai Creek
    • LSI’s Second Half of 2020
    • Drydocking of our Vessels
    • Tuna Ann and Wadi Ann reach Celebrity Status
  • 2020
    • Fireworks Display along the Dubai Coast
    • Acquisition of Wadi Ann and Sumitomo Crane | Fleet Expansion
  • 2019
    • Launch of New-Build Multi-Vessel Whiptail Ann
  • 2016
    • Burj Al Arab Hotel Sundecks
    • Artificial Reef Project – Ajman
    • LSI Works Completed over the Last Week
    • LSI tugs Towing and Assisting Vessels
    • Vessel and Crane Charter Summary (Jun-2015 to Dec-2015)
    • Bay Ann 2: LSI’s Newly Acquired 4-point Mooring Barge
    • Few of Our Vessels after Maintenance
    • Salvage of Vessel MD-I by our Tug: Hamour Ann 2
    • LSI Successfully completed Salvage operation for Vessels ‘Banda Asia’ and ‘Capricorn’
  • 2015 And Before
    • Shipping and Marine Magazine
    • LSI takes Safety Seriously
    • LSI builds “Beaufort Ann”
    • LSI builds first in house Barge – Inaugurated by Mr. Hendrik van der Linden (MD’s Father)
    • LSI initiates In-House Ship Building
    • We move our base of Operation to HFZ
    • LSI’s First Major Break for Projects

Service Inquiries

For all inquiries related to services, please contact our Commercial Department at our office.

Postal Address

P.O.Box 49252
Hamriyah Free Zone
Sharjah, United Arab Emirates

Location Address

Linden Shipping International LLC
Hamriyah Free Zone – Phase 1
Plot No. HC-07

Contact Details

T: +971 (6) 526 0003 (15 Lines)
F: +971 (6) 526 1930
E: mail@lindeninternational.ae

© All Rights Reserved - Linden Shipping International LLC