Piling Job for a Small Floating Jetty at RAK
Recently LSI Vessels Bream Ann under the command of Capt. Arnold Prado and Barge Khwar Ann loaded with Sumitomo 70 ton crawler Crane completed a Piling job for our good Client at Ras Al Khaimah for a small floating jetty which required to be relocated a few meters. Our Crane operator Mr. Mohd Ali Khan removed the steel pile at one location and reinstalled them at a new location. Bream Ann also shifted the floating Jetty.
Due to efficiency, our client managed to complete the project in just 5 days including mobilization and demobilization.