Linden Shipping International LLC
  • Home
  • About Us
    • Brief About Us
    • News & Updates
  • Services
    • Services Overview
    • Agency Services
    • Vessel Management
  • Vessels
    • Barges
    • Tugboats
    • Multicats & Passenger Vessels
    • Specialized Vessels
  • Equipment
    • Cranes
    • Auxillary
  • Projects
    • Project List
    • Gallery
  • Salvage
  • For Sale
  • Contact Us
June 10 2020

Pile Installations at Al Qana Waterfront Development Site

2020 Operations Department, Pile Installations

LSI recently completed another 6 week charter which was a Pile Installation Project in Al Qana Waterfront Development Site for a local contracting company Contracting Company at Al Maqta, Abu Dhabi. LSI Vessels Bream Ann, under the command of Capt. Bazirius John Kasese and Barge Gulf Ann 2 along with our Sumitomo Crane (Operated by our Mr Mohd Ali Khan) were active at the project Site.In order to reach to the site LSI came up with a solution to reduce the air-draft of the vessels to below 5 meter due to air-draft restrictions of a nearby bridge at the site.The project was completed on time despite the lockdown and several days of travel restrictions in the area. This was the second contractor that had chartered our equipment on the same site.
The site will become a leisure/relaxation/tourism site: (Click here to view project article ..)
Pile Installations at Al Qana Waterfront Development Site
Pile Installations at Al Qana Waterfront Development Site
Pile Installations at Al Qana Waterfront Development Site
Pile Installations at Al Qana Waterfront Development Site
Pile Installations at Al Qana Waterfront Development Site

Related Posts

LSI Vessels at Jetty Expansion Project in Bahrain

2020

Jetty Expansion Project in Bahrain

Stork Ann doing Soil Investigation at Jebel Ali

2020

Soil Investigation Project

Piling Job for Small Floating Jetty at RAK

2020

Piling Job for a Small Floating Jetty at RAK

Recent Posts

  • Network Tower Modification Project
  • Towages Done by LSI
  • Raz Markaz Oil Terminal Project
  • Acquisition of New Vessels and Crane
  • Excavation works and Quaywall placing at Al Fiyay Island, Abu Dhabi
  • 2021
    • Navigation Pile repair work of the Floating Bridge, West Side at Dubai Creek
    • LSI’s Second Half of 2020
    • Drydocking of our Vessels
    • Tuna Ann and Wadi Ann reach Celebrity Status
  • 2020
    • Fireworks Display along the Dubai Coast
    • Acquisition of Wadi Ann and Sumitomo Crane | Fleet Expansion
  • 2019
    • Launch of New-Build Multi-Vessel Whiptail Ann
  • 2016
    • Burj Al Arab Hotel Sundecks
    • Artificial Reef Project – Ajman
    • LSI Works Completed over the Last Week
    • LSI tugs Towing and Assisting Vessels
    • Vessel and Crane Charter Summary (Jun-2015 to Dec-2015)
    • Bay Ann 2: LSI’s Newly Acquired 4-point Mooring Barge
    • Few of Our Vessels after Maintenance
    • Salvage of Vessel MD-I by our Tug: Hamour Ann 2
    • LSI Successfully completed Salvage operation for Vessels ‘Banda Asia’ and ‘Capricorn’
  • 2015 And Before
    • Shipping and Marine Magazine
    • LSI takes Safety Seriously
    • LSI builds “Beaufort Ann”
    • LSI builds first in house Barge – Inaugurated by Mr. Hendrik van der Linden (MD’s Father)
    • LSI initiates In-House Ship Building
    • We move our base of Operation to HFZ
    • LSI’s First Major Break for Projects

Service Inquiries

For all inquiries related to services, please contact our Commercial Department at our office.

Postal Address

P.O.Box 49252
Hamriyah Free Zone
Sharjah, United Arab Emirates

Location Address

Linden Shipping International LLC
Hamriyah Free Zone – Phase 1
Plot No. HC-07

Contact Details

T: +971 (6) 526 0003 (15 Lines)
F: +971 (6) 526 1930
E: mail@lindeninternational.ae

© All Rights Reserved - Linden Shipping International LLC