Linden Shipping International LLC
  • Home
  • About Us
    • Brief About Us
    • News & Updates
  • Services
    • Services Overview
    • Agency Services
    • Vessel Management
  • Vessels
    • Barges
    • Tugboats
    • Multicats & Passenger Vessels
    • Specialized Vessels
  • Equipment
    • Cranes
    • Auxillary
  • Projects
    • Project List
    • Gallery
  • Salvage
  • For Sale
  • Contact Us
March 22 2022

Network Tower Modification Project

2022 Jetty Modification, Network Tower, Operations Department

Recently LSI Vessels completed a Network Tower Modification project for our Class A client at Saadiyat Jetty in Abu Dhabi. LSI Vessels, Tugboat Mullet Ann, under the command of Capt. Meidi Max and Barge GC-88 were active at the project site. Barge GC88 was loaded with a 1,000 ton mobile crane from a 3rd party supplier which did lifts of over 100-meter elevation from the barge to the top of the pylons. Linden Shipping was originally involved during the building of the artificial islands where the pylons stand which was more than 20 years ago, so we have truly come full circle on this project.
 
The scope of the project was the reconfiguration of a 400KV OHL Network which involved tower dismantling between TWPS, TANE, BAHIA, Saadiyat, ADST, and related control and protection modification works.
Well done to our client, our crews, and all those involved in the project for making it successful and without incident.
Network Tower Modification Project
Network Tower Modification Project
Network Tower Modification Project
Network Tower Modification Project
Network Tower Modification Project
Network Tower Modification Project
Network Tower Modification Project
Network Tower Modification Project
Network Tower Modification Project
Network Tower Modification Project
Network Tower Modification Project
Network Tower Modification Project
Network Tower Modification Project

Related Posts

towages1

2022

Towages Done by LSI

Raz Markaz Oil Terminal Project

2022

Raz Markaz Oil Terminal Project

Recent Posts

  • Network Tower Modification Project
  • Towages Done by LSI
  • Raz Markaz Oil Terminal Project
  • Acquisition of New Vessels and Crane
  • Excavation works and Quaywall placing at Al Fiyay Island, Abu Dhabi
  • 2021
    • Navigation Pile repair work of the Floating Bridge, West Side at Dubai Creek
    • LSI’s Second Half of 2020
    • Drydocking of our Vessels
    • Tuna Ann and Wadi Ann reach Celebrity Status
  • 2020
    • Fireworks Display along the Dubai Coast
    • Acquisition of Wadi Ann and Sumitomo Crane | Fleet Expansion
  • 2019
    • Launch of New-Build Multi-Vessel Whiptail Ann
  • 2016
    • Burj Al Arab Hotel Sundecks
    • Artificial Reef Project – Ajman
    • LSI Works Completed over the Last Week
    • LSI tugs Towing and Assisting Vessels
    • Vessel and Crane Charter Summary (Jun-2015 to Dec-2015)
    • Bay Ann 2: LSI’s Newly Acquired 4-point Mooring Barge
    • Few of Our Vessels after Maintenance
    • Salvage of Vessel MD-I by our Tug: Hamour Ann 2
    • LSI Successfully completed Salvage operation for Vessels ‘Banda Asia’ and ‘Capricorn’
  • 2015 And Before
    • Shipping and Marine Magazine
    • LSI takes Safety Seriously
    • LSI builds “Beaufort Ann”
    • LSI builds first in house Barge – Inaugurated by Mr. Hendrik van der Linden (MD’s Father)
    • LSI initiates In-House Ship Building
    • We move our base of Operation to HFZ
    • LSI’s First Major Break for Projects

Service Inquiries

For all inquiries related to services, please contact our Commercial Department at our office.

Postal Address

P.O.Box 49252
Hamriyah Free Zone
Sharjah, United Arab Emirates

Location Address

Linden Shipping International LLC
Hamriyah Free Zone – Phase 1
Plot No. HC-07

Contact Details

T: +971 (6) 526 0003 (15 Lines)
F: +971 (6) 526 1930
E: mail@lindeninternational.ae

© All Rights Reserved - Linden Shipping International LLC