Marine Construction Project at Jumeirah Islands 2

2018 Marine Construction and Engineering, Operations Department

Recently LSI’s client completed a Marine Construction Project at Jumeirah Islands 2 Dubai UAE for arguably the Largest construction firm in the middle east. LSI hired out Vessels and other marine related services out to our client which included Tugs: Halibut Ann (Capt. Mohd. Aqil Balouch), Grouper Ann, (Capt. Ibrahim Adam), Salmon Ann, (Capt. Meidi Max Koleangan) and Bass Ann, ( Capt. Rangga Syahrial) and Barges: Mina Ann, River Ann and Bab Ann – loaded with LSI Crane C60, were active in the project.
LSI Winch Operators: Mr. Golam Mostofa, Mr. Gunapala Mendon & Mr. Jayaprakash Mohanan and Crane Operators: Mr. Yasir Iqbal, Mr. Khalid Abbasi, Mr. Syed T. H. Shah & Mr. Nixon John were other personnel along with Crew that were present in the said project and making it a great success for our client and the developer.
River Ann loaded with a 280 tons crawler Crane was towed to the Project Site by our Tug Grouper Ann and several pontoons were transported to the site when the project was ongoing.
The Private Island Project was built for Royalty and is a dazzling resort in the midst of the ever-growing Jumeirah Water-front area, LSI presence took place over a span of more than 1 year which initiated in September 2017. However, the land reclamation had started much earlier by other parties. The project was completed within the projected time and all equipment’s & personnel returned back safely to LSI base.
We are deeply humbled to have worked on such an exclusive and amazing project!
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2
Marine Construction Project at Jumeirah Islands 2

Related Posts

Maintenance of Navy Aircraft Carrier

2018

Maintenance of Navy Aircraft Carrier

Transportation of Soil Investigation Rig and Pickups

2018

Transportation of Soil Investigation Rig and Pickups

Pipe Piling Installation for the new Marina Sites 1

2018

Pipe Piling Installation for the new Marina Sites

Recent Posts

  • Network Tower Modification Project
  • Towages Done by LSI
  • Raz Markaz Oil Terminal Project
  • Acquisition of New Vessels and Crane
  • Excavation works and Quaywall placing at Al Fiyay Island, Abu Dhabi
  • 2021
    • Navigation Pile repair work of the Floating Bridge, West Side at Dubai Creek
    • LSI’s Second Half of 2020
    • Drydocking of our Vessels
    • Tuna Ann and Wadi Ann reach Celebrity Status
  • 2020
    • Fireworks Display along the Dubai Coast
    • Acquisition of Wadi Ann and Sumitomo Crane | Fleet Expansion
  • 2019
    • Launch of New-Build Multi-Vessel Whiptail Ann
  • 2016
    • Burj Al Arab Hotel Sundecks
    • Artificial Reef Project – Ajman
    • LSI Works Completed over the Last Week
    • LSI tugs Towing and Assisting Vessels
    • Vessel and Crane Charter Summary (Jun-2015 to Dec-2015)
    • Bay Ann 2: LSI’s Newly Acquired 4-point Mooring Barge
    • Few of Our Vessels after Maintenance
    • Salvage of Vessel MD-I by our Tug: Hamour Ann 2
    • LSI Successfully completed Salvage operation for Vessels ‘Banda Asia’ and ‘Capricorn’
  • 2015 And Before
    • Shipping and Marine Magazine
    • LSI takes Safety Seriously
    • LSI builds “Beaufort Ann”
    • LSI builds first in house Barge – Inaugurated by Mr. Hendrik van der Linden (MD’s Father)
    • LSI initiates In-House Ship Building
    • We move our base of Operation to HFZ
    • LSI’s First Major Break for Projects

Service Inquiries

For all inquiries related to services, please contact our Commercial Department at our office.

Postal Address

P.O.Box 49252
Hamriyah Free Zone
Sharjah, United Arab Emirates

Location Address

Linden Shipping International LLC
Hamriyah Free Zone – Phase 1
Plot No. HC-07

Contact Details

T: +971 (6) 526 0003 (15 Lines)
F: +971 (6) 526 1930
E: mail@lindeninternational.ae

© All Rights Reserved - Linden Shipping International LLC